Steel Worker 1st Class Brett Sligo of Underwater Construction Team 2 inspects the split pipe installed off the coast of Kauai this June. (Photo by CE2 Daniel Lehne/UCT-2)
Date Taken: | 06.15.2012 |
Date Posted: | 10.19.2012 19:34 |
Photo ID: | 758777 |
VIRIN: | 120615-N-ZZ999-003 |
Resolution: | 3840x2880 |
Size: | 6.53 MB |
Location: | KAUAI, HAWAII, US |
Web Views: | 173 |
Downloads: | 12 |
This work, Split pipe installation [Image 7 of 7], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.