Aerial view of the Officer in Charge of Construction Portsmouth Naval Shipyard advancing the Multi-Mission Dry Dock #1 project in mid-December, pouring concrete for the base of one of the 27 monoliths being constructed in Brewer, Maine. The monoliths are just one of the many projects that are part of the Shipyard Infrastructure Optimization work being done to improve dry dock capacity and capability at Portsmouth Naval Shipyard, ensuring our fleet spends less time in maintenance and more time advancing maritime operations. (US Navy photo)
Date Taken: | 12.13.2022 |
Date Posted: | 01.13.2023 15:15 |
Photo ID: | 7588884 |
VIRIN: | 221213-O-DT551-960 |
Resolution: | 1773x1182 |
Size: | 539.34 KB |
Location: | KITTERY, MAINE, US |
Web Views: | 464 |
Downloads: | 8 |
This work, A Bird’s Eye View of Monolith Construction in Brewer, Maine [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.