Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Pre-Loaded Bombs installed [Image 5 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Pre-Loaded Bombs installed

    DYESS AIR FORCE BASE, TEXAS, UNITED STATES

    01.09.2023

    Photo by Senior Airman Josiah Brown 

    7th Bomb Wing

    A Launcher Load Frame is raised into a B-1B Lancer at Dyess Air Force Base, Texas, Jan. 9, 2023. The LLF provides a covert aircraft generation capability, where maintainers can generate conventional munitions packages out of the view of near-peer intelligence, surveillance and reconnaissance capabilities. (U.S. Air Force photo by Senior Airman Josiah Brown)

    IMAGE INFO

    Date Taken: 01.09.2023
    Date Posted: 01.23.2023 10:29
    Photo ID: 7595041
    VIRIN: 230109-F-LK778-1127
    Resolution: 6048x4024
    Size: 4.87 MB
    Location: DYESS AIR FORCE BASE, TEXAS, US

    Web Views: 138
    Downloads: 20

    PUBLIC DOMAIN