Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Fairchild preps road near main gate to be paved [Image 11 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Fairchild preps road near main gate to be paved

    FAIRCHILD AIR FORCE BASE, WASHINGTON, UNITED STATES

    03.30.2023

    Photo by Airman 1st Class Lillian Patterson 

    92nd Air Refueling Wing

    U.S. Air Force Airmen work on preparing a road near the main gate to be paved at Fairchild Air Force Base, Washington, March 30, 2023. Airmen prepared the gate to be paved in further preparation for additional maintenance on the main gate. (U.S. Air Force photo by Airman 1st Class Lillian Patterson)

    IMAGE INFO

    Date Taken: 03.30.2023
    Date Posted: 04.03.2023 13:42
    Photo ID: 7719442
    VIRIN: 033023-F-OT222-1070
    Resolution: 5914x3948
    Size: 3.63 MB
    Location: FAIRCHILD AIR FORCE BASE, WASHINGTON, US

    Web Views: 13
    Downloads: 3

    PUBLIC DOMAIN