Water pours from a pipe leak that 844th Engineer Battalion Surveyor, Staff Sgt. Sydney Parks, found during a survey for a potential project behind the Brig. Gen. George A. Morris Army Center during Operation Castle Upgrade on 9 March 2023 in Vicksburg, Miss. 390th Engineer Vertical Construction Company falls directly under the 844th Engineer Battalion. U.S. Army Reserve photo by Maj. William C. Allred, 412th Theater Engineer Command Deputy Public Affairs Officer.
Date Taken: | 03.09.2023 |
Date Posted: | 04.16.2023 14:45 |
Photo ID: | 7742571 |
VIRIN: | 230309-A-BR385-1001 |
Resolution: | 2704x2028 |
Size: | 1.57 MB |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 24 |
Downloads: | 4 |
This work, Water leak pours – Castle Upgrade [Image 10 of 10], by MAJ William Allred, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.