Jesse Dela Pena, 544th Propulsion Maintenance Squadron (left) performs a bench inspection and entering data into the production system as Jordan Hammer, 544th PMXS performs the removal of the parts off the module itself. Improving processes allowed the team at the Oklahoma City Air Logistics Complex, Tinker Air Force Base, Okla. to cut F135 engine repair and overhaul time from 244 flow days to 106 flow days. (U.S. Air Force courtesy photo)
Date Taken: | 10.19.2022 |
Date Posted: | 04.21.2023 16:50 |
Photo ID: | 7753982 |
VIRIN: | 221019-F-F3233-1006 |
Resolution: | 5760x3240 |
Size: | 4.42 MB |
Location: | TINKER AIR FORCE BASE, OKLAHOMA, US |
Web Views: | 71 |
Downloads: | 8 |
This work, F-135 Heavy Maintenance Center at Oklahoma City Air Logistics Complex [Image 3 of 3], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.