A Federal Aviation Administration aircraft flies over the runway at Ascension Island Auxiliary Airfield to conduct testing and inspection of the new infrastructure, April 29, 2023. The runway certification completes a three-year effort, led by the Air Force Installation and Mission Support Center, which called for full-depth runway replacement and airfield infrastructure upgrades. (U.S. Air Force photo)
Date Taken: | 04.28.2023 |
Date Posted: | 05.17.2023 09:37 |
Photo ID: | 7792703 |
VIRIN: | 230504-F-ZZ988-401 |
Resolution: | 4032x3024 |
Size: | 1.85 MB |
Location: | SAN ANTONIO, TEXAS, US |
Web Views: | 92 |
Downloads: | 10 |
This work, Ascension Island runway replacement [Image 2 of 2], by Mila Cisneros, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.