Construction of a new drainage pipe on the aircraft parking ramp and taxiway at Rosecrans Air National Guard Base continues on May 16, 2023. Replacing the old drainage pipe is part of an ongoing runway construction project that involves replacement of both airport runways. (U.S. Air National Guard photo by Michael Crane)
Date Taken: | 05.16.2023 |
Date Posted: | 05.17.2023 09:58 |
Photo ID: | 7801311 |
VIRIN: | 230516-Z-UP142-0033 |
Resolution: | 4996x3324 |
Size: | 1.24 MB |
Location: | SAINT JOSEPH, MISSOURI, US |
Web Views: | 12 |
Downloads: | 9 |
This work, Aircraft ramp, taxiway get new drainage pipe [Image 5 of 5], by Michael Crane, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.