Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Mountlake Terrace Ballinger Park Aquatic Ecosystem Restoration Project [Image 4 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Mountlake Terrace Ballinger Park Aquatic Ecosystem Restoration Project

    MOUNTLAKE TERRACE, WASHINGTON, UNITED STATES

    05.23.2023

    Photo by Nicole Celestine 

    U.S. Army Corps of Engineers, Seattle District

    Photo of the U.S. Army Corps of Engineers official signage highlighting the Lake Ballinger Ecosystem Restoration Project at Ballinger Park, Mountlake Terrace, Washington. Construction to restore a fish and wildlife habitat for over 16 acres of a former golf course began mid-May 2023 and will continue through spring 2024. The total $5.5 million project construction cost, of which $3.4 million comes from Bipartisan Infrastructure Law (BIL) funding that President Joseph R. Biden signed into law in November 2021, includes replacing a vehicle crossing and adding a pedestrian boardwalk to provide access to people, while limiting damage to plants and wetland soils. Minor enhancements to pond habitat are also planned.

    IMAGE INFO

    Date Taken: 05.23.2023
    Date Posted: 05.29.2023 00:44
    Photo ID: 7816089
    VIRIN: 230523-A-VA654-398
    Resolution: 1616x1080
    Size: 326.18 KB
    Location: MOUNTLAKE TERRACE, WASHINGTON, US

    Web Views: 25
    Downloads: 1

    PUBLIC DOMAIN