Billie Boyd, lockmaster at U.S. Army Corps of Engineers Nashville District's Cheatham Lock, explains the function of the upper land wall machinery house to a USACE videographer Nov. 13, 2012. The lock was closed for one month to permit major maintenance repairs to hydraulic and mechanical equipment damaged during the 2010 flood along with other routine maintenance. (USACE photo by Fred Tucker)
Date Taken: | 11.13.2012 |
Date Posted: | 11.15.2012 12:33 |
Photo ID: | 783206 |
VIRIN: | 121113-A-HL948-002 |
Resolution: | 2114x2643 |
Size: | 4.04 MB |
Location: | ASHLAND CITY, TENNESSEE, US |
Web Views: | 26 |
Downloads: | 0 |
This work, Cheatham Lock scheduled to reopen after major maintenance repairs [Image 7 of 7], by Fred Tucker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.