Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Charleroi lock construction enters final project phase [Image 6 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Charleroi lock construction enters final project phase

    PITTSBURGH, PENNSYLVANIA, UNITED STATES

    05.31.2023

    Photo by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    Stephen Dine, the U.S. Army Corps of Engineers Pittsburgh District resident engineer for the Charleroi construction project, poses for a portrait at the Monongahela River Locks and Dam 4 in Charleroi, Pennsylvania, May 31, 2023.

    The Pittsburgh District has refilled the newly constructed lock chamber with 18 million gallons of water and has entered the final construction phase.

    Next, the district will install miter gates and test the mechanical and electric locking components. The district expects the new lock to go into operation in 2024. The construction project at Charleroi is part of the Lower Mon Project, sometimes referred to as a "mega project" because of its size and scope.

    (U.S. Army Corps of Engineers Pittsburgh District Photos by Michel Sauret)

    IMAGE INFO

    Date Taken: 05.31.2023
    Date Posted: 06.09.2023 13:13
    Photo ID: 7849813
    VIRIN: 230531-A-TI382-0299
    Resolution: 5472x3648
    Size: 2.56 MB
    Location: PITTSBURGH, PENNSYLVANIA, US

    Web Views: 14
    Downloads: 5

    PUBLIC DOMAIN