U.S. Airmen assigned to the 202nd Engineering Installation Squadron, 116th Air Control Wing (ACW), Georgia Air National Guard, prepare to run communication lines through a series of manholes at the 165th Airlift Wing (AW) located at the Savannah Air National Guard Base in Savannah, Georgia, June 9, 2023. 165 AW and 116 ACW worked together to install communication cables that will serve as backup comms for the 165th Air Support Operations Squadron. (U.S. Air National Guard photo by Senior Airman Victoria Coursey)
Date Taken: | 06.09.2023 |
Date Posted: | 06.11.2023 11:31 |
Photo ID: | 7852786 |
VIRIN: | 230610-Z-NG731-1001 |
Resolution: | 4364x3834 |
Size: | 2.11 MB |
Location: | SAVANNAH, GEORGIA, US |
Web Views: | 14 |
Downloads: | 12 |
This work, 165 AW, 116 ACW partner for comms installation at Savannah ANGB [Image 4 of 4], by SrA Victoria Coursey, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.