Construction workers observe as a hole is drilled into box culverts in preparation for manhole covers during construction on Zone 1 at Tyndall Air Force Base, Florida, June 9, 2023. The U.S. Army Corps of Engineers awarded a $532 million construction contract to deliver 11 projects that directly support flight line operations for Tyndall’s F-35A Lightning II aircraft slated to arrive in August 2023. (U.S. Air Force photo by Airman 1st Class Zachary Nordheim)
Date Taken: | 06.09.2023 |
Date Posted: | 06.13.2023 15:14 |
Photo ID: | 7858141 |
VIRIN: | 230609-F-BE826-1119 |
Resolution: | 6048x4024 |
Size: | 9.45 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 39 |
Downloads: | 6 |
This work, Slow and steady builds the flight line [Image 8 of 8], by SrA Zachary Nordheim, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.