Officials from the 513th Air Control Group, Tinker Air Force Base, Air Force Reserve, Fortis Networks, Inc. and the U.S. Army Corps of Engineers gathered to break ground on the new operations facility April 14, 2016, during a ceremony in the field east of the 72nd Air Base Wing Headquarters, Bldg. 460, at Tinker Air Force Base, Oklahoma. The 32,000 sq. ft. facility will allow the currently physically separated units to have a consolidated Air Control Group Headquarters, Operations Support Flight and Airborne Air Control Squadron facility. The building is scheduled to be completed by January 2018. (U.S. Air Force photo by Maj. Jon Quinlan)
Date Taken: | 04.14.2016 |
Date Posted: | 06.23.2023 14:56 |
Photo ID: | 7878736 |
VIRIN: | 140416-F-VM627-1204 |
Resolution: | 5723x3954 |
Size: | 1.71 MB |
Location: | TINKER AIR FORCE BASE, OKLAHOMA, US |
Web Views: | 26 |
Downloads: | 3 |
This work, Reserve AWACS unit breaks ground on new facility [Image 4 of 4], by Lt. Col. Jon Quinlan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.