U.S. Airmen assigned to the 357th Fighter Generation Squadron push a trailer during a training exercise at Davis-Monthan Air Force Base, Ariz., July 21, 2023. The Airmen had between 12 and 24 hours to make the training jet combat-ready. (U.S. Air Force photo by Airman 1st Class Devlin Bishop)
Date Taken: | 07.21.2023 |
Date Posted: | 07.24.2023 17:41 |
Photo ID: | 7931744 |
VIRIN: | 230721-F-NC910-1094 |
Resolution: | 3000x1996 |
Size: | 3.04 MB |
Location: | DAVIS-MONTHAN AFB, ARIZONA, US |
Web Views: | 38 |
Downloads: | 8 |
This work, 357th FGS readiness exercise [Image 10 of 10], by SrA Devlin Bishop, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.