Liliana Villarreal, NASA Recovery Director, NASA's landing and recovery director, speaks to various news reporters about the successful completion of Underway Recovery Test (URT) 10 with amphibious transport dock ship USS John P. Murtha (LPD 26) at Naval Base San Diego, Aug. 2, 2023. In preparation for NASA's Artemis II crewed mission, which will send four astronauts in Orion beyond the Moon, NASA and the U.S. Navy will conduct a series of tests to demonstrate and evaluate the processes, procedures, and hardware used in recovery operations for crewed lunar missions. The U.S. Navy has many unique capabilities that make it an ideal partner to support NASA, including its amphibious capabilities with the ability to embark helicopters, launch and recover small boats, three-dimensional air search radar and advanced medical facilities. (U.S. Navy Photo by Mass Communication Specialist 2nd Class Joshua Samoluk)
Date Taken: | 08.02.2023 |
Date Posted: | 08.04.2023 10:24 |
Photo ID: | 7952768 |
VIRIN: | 230802-N-YT019-1013 |
Resolution: | 5568x3712 |
Size: | 591.44 KB |
Location: | SAN DIEGO, CALIFORNIA, US |
Web Views: | 27 |
Downloads: | 4 |
This work, U.S. Navy and NASA URT-10 Press Conference [Image 2 of 2], by PO2 Joshua Samoluk, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.