Photo of a sculpin fish specialists with The Watershed Company, a Seattle-area environmental services and landscape architecture firm, captured and relocated along a section of Hall Creek upstream from the outlet to Lake Ballinger, in Mountlake Terrace, Washington. The specialists captured and relocated sculpin, cutthroat, crawfish and stickleback, as part of the $5.5 million ecosystem restoration project.
Date Taken: | 08.30.2023 |
Date Posted: | 09.02.2023 01:49 |
Photo ID: | 8001630 |
VIRIN: | 230830-A-VA654-1519 |
Resolution: | 2250x3000 |
Size: | 2.77 MB |
Location: | MOUNTLAKE TERRACE, WASHINGTON, US |
Web Views: | 11 |
Downloads: | 2 |
This work, Mountlake Terrace Aquatic Ecosystem Restoration Project [Image 8 of 8], by Nicole Celestine, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.