Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Infrastructure, excavation work underway for construction of third $28.08 million, four-story, 60,000-square-foot barracks at Fort McCoy [Image 85 of 92]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Infrastructure, excavation work underway for construction of third $28.08 million, four-story, 60,000-square-foot barracks at Fort McCoy

    Contractors work on the construction area Oct. 18, 2023, in the 1600 block of the cantonment area at Fort McCoy, Wis., for a new construction project to build a $28.08 million barracks building. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings — one that is almost done, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 10.18.2023
    Date Posted: 10.18.2023 15:30
    Photo ID: 8078113
    VIRIN: 231018-A-OK556-2328
    Resolution: 3034x1869
    Size: 1.69 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 2
    Downloads: 3

    PUBLIC DOMAIN