Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Ashtabula Harbor Buoy Installation [Image 3 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Ashtabula Harbor Buoy Installation

    ASHTABULA , OHIO, UNITED STATES

    10.24.2023

    Photo by Andrew Kornacki 

    U.S. Army Corps of Engineers, Buffalo District

    A recovered buoy is prepared for installation by U.S. Army Corps of Engineers, Buffalo District along the edge of the Ashtabula Beneficial Use of Dredged Sediment project within Ashtabula Harbor, Ashtabula, Ohio, October 25, 2023.

    The buoys mark the location of the submerged stone wall along the inside of the harbor’s east breakwater. Boaters are encouraged to stay safe when boating by staying within the federal navigation channel until you outside the harbor.

    IMAGE INFO

    Date Taken: 10.24.2023
    Date Posted: 10.30.2023 14:16
    Photo ID: 8096175
    VIRIN: 231025-A-IF251-5827
    Resolution: 3000x4000
    Size: 0 B
    Location: ASHTABULA , OHIO, US

    Web Views: 7
    Downloads: 2

    PUBLIC DOMAIN