Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Gavins Point Dam releases to be reduced to winter release rate [Image 2 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Gavins Point Dam releases to be reduced to winter release rate

    OMAHA, NEBRASKA, UNITED STATES

    11.03.2023

    Photo by Eileen Williamson 

    U.S. Army Corps of Engineers, Northwestern Division

    Missouri River monthly update for November showing the system storage and reservoir storage comparison charts for the Missouri River Mainstem System and the "big three" dams of Fort Peck, Garrison, and Oahe Dam. Winter releases from Gavins Point Dam for the 2023-2024 winter will be slightly higher than last winter, which were at the minimum rate. Intake operators in the lower river should be taking measures to assure they can maintain access to the water.

    IMAGE INFO

    Date Taken: 11.03.2023
    Date Posted: 11.06.2023 13:29
    Photo ID: 8109543
    VIRIN: 231103-A-RO090-1001
    Resolution: 3358x2501
    Size: 1.91 MB
    Location: OMAHA, NEBRASKA, US

    Web Views: 40
    Downloads: 2

    PUBLIC DOMAIN