From the vantage point of the Dallas levee access road, Aaron Philips, USACE Construction Project Coordinator, right, overlooks 277k levee construction area with a with a construction company representative during final inspection.
Date Taken: | 08.03.2023 |
Date Posted: | 11.16.2023 15:55 |
Photo ID: | 8126734 |
VIRIN: | 230803-A-QV643-1003 |
Resolution: | 4032x3024 |
Size: | 2.28 MB |
Location: | DALLAS, TEXAS, US |
Web Views: | 48 |
Downloads: | 3 |
This work, Milestone Achievement for Dallas Floodway Project: Providing Flood Risk Management to Communities [Image 2 of 2], by Audrey Gossett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.