Regasification terminal installed at the Palo Seco Power Plant in San Juan, Puerto Rico as part of the temporary power mission executed by the Federal Emergency Management Agency, the U.S. Army Corps of Engineers, and Weston Solutions, Inc. (U.S. Army Photo by Samuel Weldin)
Date Taken: | 06.07.2023 |
Date Posted: | 11.22.2023 11:53 |
Photo ID: | 8134389 |
VIRIN: | 230607-A-OK605-1011 |
Resolution: | 6720x4480 |
Size: | 3.6 MB |
Location: | US |
Web Views: | 35 |
Downloads: | 5 |
This work, Omaha District, partners successfully complete temporary power mission in San Juan [Image 7 of 7], by Samuel Weldin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.