Merchant tanker Yosemite Trader, moored at Joint Base Pearl Harbor-Hickam, Hawaii, completes the gravity draining fuel transfer process from the Red Hill Bulk Fuel Storage Facility (RHBFSF) Dec. 7, 2023. JTF-RH is in the fifth and final phase of its defueling plan, where JTF-RH along with Defense Logistics Agency Energy and Fleet Logistics Center Pearl Harbor, are safely defueling the RHBFSF. Phase 5 defueling continues with JTF-RH unpacking the fuel pipelines, and removing residual fuel located in the surge lines and portions of the tank gallery. JTF-RH is expected to complete its defueling mission at the end of Phase 5, which is projected to end no later than March 31, 2024. (DoD photo by U.S. Army Sgt. ZaBarr Jones)
Date Taken: | 12.07.2023 |
Date Posted: | 12.08.2023 17:48 |
Photo ID: | 8159580 |
VIRIN: | 231207-A-EE372-1042 |
Resolution: | 1920x1080 |
Size: | 941.76 KB |
Location: | HAWAII, US |
Web Views: | 69 |
Downloads: | 4 |
This work, Joint Task Force-Red Hill Completes Red Hill Bulk Fuel Storage Facility “Flowable Tank Bottoms” Defueling [Image 4 of 4], by SGT ZaBarr Jones, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.