Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    600-hour phase inspection [Image 2 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    600-hour phase inspection

    COCOA BEACH, FLORIDA, UNITED STATES

    11.29.2023

    Photo by Staff Sgt. Darius Sostre-Miroir 

    920th Rescue Wing

    Tech. Sgt. Juan Fernandez, 920th Maintenance Squadron crew chief, and Staff Sgt. Matthew Bean, 920th Aircraft Maintenance Squadron crew chief, install a tail gear box on an HH-60G Pave Hawk helicopter during a 600-hour phase inspection at Patrick Space Force Base, Florida, Nov. 29, 2023. During a 600-hour phase inspection the Pave Hawk is stripped, inspected and reassembled. The end goal of this inspection is to have a fully mission capable aircraft. The 920th MXS is responsible for back shop and heavy maintenance on the wing’s HC-130J Combat King II aircraft and HH-60G Pave Hawk helicopters. (U.S. Air Force photo by Tech. Sgt. Darius Sostre-Miroir)

    IMAGE INFO

    Date Taken: 11.29.2023
    Date Posted: 12.12.2023 19:14
    Photo ID: 8164136
    VIRIN: 231129-F-UG813-1007
    Resolution: 5051x3813
    Size: 1.4 MB
    Location: COCOA BEACH, FLORIDA, US

    Web Views: 36
    Downloads: 3

    PUBLIC DOMAIN