The area where an excavator took down a building in the 1600 block of the cantonment area is shown Dec. 12, 2023, at Fort McCoy, Wis. The work was to make way for more construction in the future for two more brigade headquarters buildings that will be constructed. That construction will be managed by the Army Corps of Engineers. The work also aligns with the Fort McCoy Master Plan for construction to improve the installation’s infrastructure, and more. (U.S. Army Photo by Scott T. Sturkol, Fort McCoy Public Affairs Office)
Date Taken: | 12.12.2023 |
Date Posted: | 12.31.2023 22:35 |
Photo ID: | 8185655 |
VIRIN: | 231212-A-OK556-4947 |
Resolution: | 3804x2625 |
Size: | 3 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 48 |
Downloads: | 2 |
This work, Contractors demolish old Installation Legal Office building at Fort McCoy [Image 20 of 20], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.