Hangar 1 rapidly advances toward becoming part of the future home of F-35 Lightning fighter jets. The building is close to 30 percent complete and vertical construction is evident as foundations, concrete masonry block, structural steel and roof elements are installed. Hangar 1 construction is expected to be complete in late 2025. All eleven Zone 1 facilities will be completed during 2026. (USAF Photo by Christine Alombro Walker)
Date Taken: | 11.30.2023 |
Date Posted: | 01.03.2024 09:49 |
Photo ID: | 8187393 |
VIRIN: | 240102-F-QF062-9001 |
Resolution: | 1000x666 |
Size: | 244.38 KB |
Location: | PANAMA CITY, FLORIDA, US |
Web Views: | 40 |
Downloads: | 2 |
This work, Construction is transforming Tyndall AFB flightline [Image 3 of 3], by christine walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.