Ongoing beachfill operations in Lewes, Delaware. Work is designed to reduce to risk of storm damages to infrastructure. Work should be completed sometime in January 2024 (Photos by Ed Voigt).
Date Taken: | 12.22.2023 |
Date Posted: | 01.05.2024 14:38 |
Photo ID: | 8190277 |
VIRIN: | 231222-O-XP172-4930 |
Resolution: | 4896x3672 |
Size: | 1.97 MB |
Location: | LEWES, DELAWARE, US |
Web Views: | 6 |
Downloads: | 2 |
This work, Lewes Beachfill Operations [Image 4 of 4], by Katherine Tracey, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.