The Expeditionary Littoral Enabler floating dock sits on the beach of the Del Mar Boat Basin after testing its performance as part of Project Convergence Capstone 4, Feb. 25, 2024 at Camp Pendleton, CA.
The ELE was designed to be an innovative expeditionary inflatable pier in order to allow temporary load/offload use from shore to sea.
PC-C4 is an Army-hosted, all-Service and multinational experiment. During PC-C4, the Marine Corps Warfighting Laboratory tested new technologies and capabilities and emerging concepts, including the multi-domain corridor. The Marine Corps’ participation in PC-C4 supported Force Design initiatives, integrated Joint force and Coalition capabilities into experimentation, and demonstrated the Marine Corps’ commitment to the Joint Warfighting Concept. (US Marine Corps photo by Kevin Ray J. Salvador)
Date Taken: | 02.25.2024 |
Date Posted: | 03.20.2024 10:12 |
Photo ID: | 8296230 |
VIRIN: | 240225-M-AJ782-2470 |
Resolution: | 6000x4000 |
Size: | 3.39 MB |
Location: | CAMP PENDLETON, CALIFORNIA, US |
Web Views: | 49 |
Downloads: | 4 |
This work, Marine Corps Warfighting Laboratory's Expeditionary Littoral Enabler at Project Convergence Capstone 4 [Image 5 of 5], by Kevin Ray Salvador, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.