ROK Soldiers assigned to the 5th Corps Engineering Brigade River Crossing Company and Soldiers assigned to the 11th Engineer Battalion, 2nd Infantry Division Sustainment Brigade, 2nd Infantry Division ROK/U.S. Combined Division, complete construction on a joint bridge, during a combined wet gap crossing exercise, near the Imjin River in Paju-si, Gyeonggi-do from March 11-20, 2024. ROK and U.S. Army units utilized aviation, armor, air defense, chemical, biological and defense capabilities to train the security and protection of the site during the exercise that was designed to verify interoperability through the construction of a joint pontoon bridge. (U.S. Army photo by Pak, Chin-U)
Date Taken: | 03.20.2024 |
Date Posted: | 03.20.2024 04:18 |
Photo ID: | 8298663 |
VIRIN: | 240320-A-TR271-3025 |
Resolution: | 6463x4309 |
Size: | 23.28 MB |
Location: | CAMP HUMPHREYS, KR |
Web Views: | 147 |
Downloads: | 3 |
This work, U.S. Army Engineers Complete Wet Gap Crossing with the ROK Army [Image 2 of 2], by Chin-U Pak, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.