Work recently began to replace the bridge over Indiantown Run that connects Lake Road at Marquette Lake with Asher Miner Road (Route 443) at Fort Indiantown Gap. When completed, the new two-lane bridge will serve as both the entrance and exit for the lake and the Keystone Conference Center, and the road over the Marquette Lake dam that is currently used as the entrance to the lake and the KCC will be closed to vehicular traffic. (Pennsylvania National Guard photo by Brad Rhen)
Date Taken: | 03.28.2024 |
Date Posted: | 03.28.2024 15:18 |
Photo ID: | 8311864 |
VIRIN: | 240328-Z-WW085-1008 |
Resolution: | 4811x3207 |
Size: | 3.99 MB |
Location: | FORT INDIANTOWN GAP, PENNSYLVANIA, US |
Web Views: | 23 |
Downloads: | 3 |
This work, Work underway on Marquette Lake bridge project [Image 2 of 2], by Brad Rhen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.