An 85-inch diameter pile is driven in by a vibratory hammer in support of construction operations for the new Dry Dock 5 project at Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility March 18, 2024. The new dry dock is a five-year project that will enhance and maintain the Navy’s capability and capacity to repair, maintain, and modernize Navy fast-attack submarines and surface ships in the region. (U.S. Navy photo by Joel Onemu)
Date Taken: | 03.20.2024 |
Date Posted: | 03.28.2024 19:47 |
Photo ID: | 8312348 |
VIRIN: | 240320-O-XP232-9057 |
Resolution: | 7008x4672 |
Size: | 7.47 MB |
Location: | HONOLULU, HAWAII, US |
Web Views: | 63 |
Downloads: | 3 |
This work, Pearl Harbor Naval Shipyard Dry Dock 5 Construction [Image 6 of 6], by Joel Onemu, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.