Highly trained demolition crews begin cutting the top portion of the north side of the collapsed Frances Scott Key Bridge into smaller sections for safe removal by crane in the Patapsco River, in Baltimore, March 30, 2024. Salvage teams use an exothermic cutting torch to systematically separate sections of the steel bridge, which will be taken to a disposal site. (Key Bridge Response 2024 Unified Command photo by U.S. Coast Guard Petty Officer 3rd Class Kimberly Reaves)