A U.S. Army Corps of Engineers contractor places erosion control materials on a cleared property during Phase 2 debris removal operations April 05 in Lahaina, Hawaii. Erosion control is used for soil stabilization and is the last step in the debris removal process before right of entry is relinquished back to the County of Maui.
Date Taken: | 04.05.2024 |
Date Posted: | 04.08.2024 17:51 |
Photo ID: | 8327996 |
VIRIN: | 240405-A-MW145-1001 |
Resolution: | 5472x3648 |
Size: | 7.54 MB |
Location: | LAHAINA, HAWAII, US |
Web Views: | 42 |
Downloads: | 5 |
This work, Soil sampling, erosion control signal final steps of USACE debris removal process [Image 3 of 3], by Stacey Reese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.