KITTERY, Maine (Apr. 1, 2024) Portsmouth Naval Shipyard: A temporary lifting device arrived at Portsmouth Naval Shipyard after being transported on a specialty barge from Cianbro Corporation's Modular Manufacturing Facility in Brewer, Maine on April 1. The device is at the shipyard to support the Multi-Mission Dry Dock #1 project, which is being completed as part of the Shipyard Infrastructure Optimization Program. (U.S. Navy photo by Jim Cleveland/Released)
Date Taken: | 04.01.2024 |
Date Posted: | 04.09.2024 12:30 |
Photo ID: | 8329343 |
VIRIN: | 240401-N-TT535-1018 |
Resolution: | 3000x2400 |
Size: | 917.01 KB |
Location: | KITTERY, MAINE, US |
Web Views: | 61 |
Downloads: | 3 |
This work, Temporary Lifting Device Arrives at Portsmouth Naval Shipyard [Image 2 of 2], by Janice Hussey, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.