A contractor tears out formwork in preparation to have concrete poured into the isolated columns of the chapel facility at Tyndall Air Force Base, Florida, March 28, 2024. The nearly 22,000-square-foot chapel facility is estimated to be completed by early 2025. (U.S. Air Force photo by Venessa Armenta)
Date Taken: | 03.28.2024 |
Date Posted: | 04.16.2024 15:51 |
Photo ID: | 8343811 |
VIRIN: | 240328-F-NF392-3071 |
Resolution: | 7781x5187 |
Size: | 1.7 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 21 |
Downloads: | 2 |
This work, Tyndall Chapel [Image 6 of 6], by Venessa Armenta, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.