The construction area for a new $28.08 million barracks building is shown April 22, 2024, at Fort McCoy, Wis., as framing of the building continues to take place. The contractor for the project, BlindermanPower (Construction), received the notice to proceed with construction on Sept. 26, 2023, and has 780 calendar days to complete the project. The project requires building a four-story, 60,000-square-foot barracks about to house 400 people. Two other barracks of the same specifications have already been built in the same block at the installation since 2019. Overall, it is part of a big transformation taking place at the 1600 block that includes the building of four barracks — two of which are already done, three brigade headquarters buildings, and two planned transient training officer quarters, according to the Fort McCoy Directorate of Public Works. This project is managed by the Army Corps of Engineers. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 04.22.2024 |
Date Posted: | 04.29.2024 12:30 |
Photo ID: | 8369264 |
VIRIN: | 240422-A-OK556-8635 |
Resolution: | 4861x3241 |
Size: | 2.42 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 0 |
Downloads: | 0 |
This work, April 2024 barracks construction operations at Fort McCoy [Image 27 of 27], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.