Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Little Goose Lock and Dam Stator Test [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Little Goose Lock and Dam Stator Test

    LACROSSE, WASHINGTON, UNITED STATES

    05.02.2024

    Photo by Noe Gonzalez 

    U.S. Army Corps of Engineers Walla Walla District

    Frances Sorrel, Commissioning Technician, and Oscar Garcia, General Specialist contractors from General Electric work together to test a Stator component at Little Goose Lock and Dam. The Stator generates electricity as it rotates inside of a hydropower unit. Crew members work to identify any errors in the stator through an electronic system known as an electromagnetic Coren Prediction Detector (ELCIE), this instrument is used to identify fault or damage in an electrical current. The powerhouse has six 135,000-kilowatt units – 810-megawatt total powerhouse capacity. During fiscal year 2023, 1.5 billion watts of power, were produced.

    IMAGE INFO

    Date Taken: 05.02.2024
    Date Posted: 05.14.2024 14:24
    Photo ID: 8404143
    VIRIN: 240502-A-LQ420-4347
    Resolution: 6048x4024
    Size: 881.08 KB
    Location: LACROSSE, WASHINGTON, US

    Web Views: 28
    Downloads: 1

    PUBLIC DOMAIN