Norfolk Naval Shipyard undocked USS Toledo (SSN 769) May 15! The Los Angeles-class submarine is finishing an Engineered Overhaul with the boat reaching more than 95 percent complete on production work. Now pierside, the Toledo project and crew shift to end game jobs including moving the crew aboard, mast and periscope installation, and engine room testing. “Thank you. Congratulations to the entire Toledo team who supported this successful undocking!” said Shipyard Commander Captain Jip Mosman. “Commitment, communication, and coordination have been key to reaching this key event. The Toledo project has been building momentum over the past several months, and we look forward to that continuing on to the completion of this Engineered Overhaul when Toledo returns to the Fleet to carry out its operational mission!”
Date Taken: | 05.14.2024 |
Date Posted: | 05.20.2024 08:57 |
Photo ID: | 8417084 |
VIRIN: | 240515-O-YO710-1643 |
Resolution: | 6022x4015 |
Size: | 2.59 MB |
Location: | US |
Web Views: | 54 |
Downloads: | 2 |
This work, Undocking USS Toledo (SSN 769) [Image 14 of 14], by Shelby West, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.