An aerial view of the Starved Rock Breakwater Project where riprap was placed along the northern edge of the former Delbridge Island with the structure measuring approximately 6,100 feet long.
Date Taken: | 05.14.2024 |
Date Posted: | 05.21.2024 15:43 |
Photo ID: | 8421157 |
VIRIN: | 240514-A-A5019-1001 |
Resolution: | 4056x3040 |
Size: | 3.64 MB |
Location: | ILLINOIS, US |
Web Views: | 17 |
Downloads: | 1 |
This work, Rock Solid Project Completed [Image 4 of 4], by Kelcy Hanson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.