Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New aerial footage reveals progress of Baltimore bridge wreckage removal [Image 5 of 5]

    New aerial footage reveals progress of Baltimore bridge wreckage removal

    BALTIMORE, MARYLAND, UNITED STATES

    06.07.2024

    Courtesy Photo

    U.S. Army Corps of Engineers, Baltimore District   

    Unified Command’s ongoing salvage work in the Fort McHenry Federal Channel nears its conclusion, as shown in these aerial photos taken Friday afternoon, June 7, 2024. Courtesy of Maryland State Police Aviation Command, salvors continue pulling massive, mangled chunks of Francis Scott Key Bridge wreckage from the watery depths of the Patapsco River.

    “We remain confident we will have the Federal Channel fully restored in the next few days. We’re using the same detailed process as when opening the three alternate channels and the Limited Access Channel. Once the wreckage is cleared, we will sweep the area with sonar, LIDAR and magnetometer, to investigate any high spots, ensuring there’s no hazard to navigation.”

    “We are going to be as thorough and disciplined as we have been since the beginning – we owe it to Baltimore and the Port, to turn over a safe navigation channel they can use with the greatest of confidence,” Pinchasin said.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.07.2024
    Date Posted: 06.09.2024 21:20
    Photo ID: 8462879
    VIRIN: 240607-A-A1420-1605
    Resolution: 4032x3024
    Size: 4.33 MB
    Location: BALTIMORE, MARYLAND, US

    Web Views: 599
    Downloads: 3

    PUBLIC DOMAIN