Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    In November 2021, construction was complete on the Indian River Lagoon-South (IRL) C-44 Reservoir and Stormwater Treatment Area (STA). [Image 6 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    In November 2021, construction was complete on the Indian River Lagoon-South (IRL) C-44 Reservoir and Stormwater Treatment Area (STA).

    In November 2021, construction was complete on the Indian River Lagoon-South (IRL) C-44 Reservoir and Stormwater Treatment Area (STA). The IRL Watershed captures local runoff from the C-44 basin, reducing average annual total nutrient loads and improves salinity in the St. Lucie Estuary.

    IMAGE INFO

    Date Taken: 03.28.2024
    Date Posted: 06.17.2024 09:21
    Photo ID: 8464450
    VIRIN: 240531-A-FY346-1006
    Resolution: 6000x4000
    Size: 6.97 MB
    Location: US

    Web Views: 6
    Downloads: 0

    PUBLIC DOMAIN