Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Corps of Engineers enhances Caney Fork River ecosystem with Center Hill Dam orifice gate reinstallation [Image 6 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Corps of Engineers enhances Caney Fork River ecosystem with Center Hill Dam orifice gate reinstallation

    TENNESSEE, UNITED STATES

    06.10.2024

    Photo by Michael Davis 

    U.S. Army Corps of Engineers, Nashville District

    U.S. Army Corps of Engineers mechanics ensure the Center Hill Dam orifice gate is aligned correctly as it is lowered into position after being removed last fall for inspection, at Center Hill Dam in Lancaster, Tennessee, June 10, 2024. The reinstallation of the gate establishes a new summer/fall minimum flow regime aimed at enhancing the habitat of the renowned cold-water trout fishery situated below the dam on Caney Fork River. (USACE Photo by Michael Davis)

    IMAGE INFO

    Date Taken: 06.10.2024
    Date Posted: 06.10.2024 15:21
    Photo ID: 8464883
    VIRIN: 240610-A-US975-1041
    Resolution: 3084x4633
    Size: 2.55 MB
    Location: TENNESSEE, US

    Web Views: 23
    Downloads: 0

    PUBLIC DOMAIN