Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    18th CES gets the job done [Image 3 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    18th CES gets the job done

    KADENA AIR BASE, OKINAWA, JAPAN

    06.10.2024

    Photo by Airman 1st Class Jonathan Sifuentes 

    18th Wing

    James Hawley, left, 18th Civil Engineer Squadron water and fuel system maintenance, and U.S. Air Force Senior Airman Devon Elcock-holder, 18th CES water and fuels system maintenance, prepare a sump pump during an emergency ground repair project at Kadena Air Base, Japan, June 10, 2024. The device was used to pump unwanted water and sewage out of a construction area that flooded due to broken pipelines and heavy rain. (U.S. Air Force photo by Airman 1st Class Jonathan R. Sifuentes)

    IMAGE INFO

    Date Taken: 06.10.2024
    Date Posted: 06.12.2024 03:17
    Photo ID: 8468744
    VIRIN: 240610-F-TK870-1041
    Resolution: 6022x4015
    Size: 15.83 MB
    Location: KADENA AIR BASE, OKINAWA, JP

    Web Views: 13
    Downloads: 2

    PUBLIC DOMAIN