City of Selma Mayor James Perkins, Jr., center, cuts the ribbon while other dignitaries join in during the ribbon-cutting ceremony for Project 14 in Selma, Alabama, July 8, 2024. Project 14 was completed by the U.S. Army Corps of Engineers, Mobile District, and stabilized the bank of the Alabama River behind the historic train depot in Selma. (U.S. Army photo by Chuck Walker)
Date Taken: | 06.21.2023 |
Date Posted: | 07.09.2024 15:26 |
Photo ID: | 8519486 |
VIRIN: | 240708-A-VP913-1005 |
Resolution: | 7320x3300 |
Size: | 4.09 MB |
Location: | MOBILE, ALABAMA, US |
Web Views: | 68 |
Downloads: | 4 |
This work, Mobile District completes project in historic Selma [Image 5 of 5], by Charles Walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.