The Arleigh burke-class guided-missile destroyer USS Hopper (DDG 70) enters Dry Dock 4, Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility, Hawaii, June 27, 2024. Hopper entered a Drydocking Selected Restricted Availability which is scheduled to be complete August 2025. During this time structural, mechanical, and preservation issues will be addressed. PHNSY & IMF is the largest, most comprehensive fleet repair and maintenance facility between the U.S. West Coast and the Far East and provides a capable, ready and "Fit to Fight" fleet. (U.S. Navy photo by Claudia LaMantia)
Date Taken: | 06.27.2024 |
Date Posted: | 07.19.2024 12:52 |
Photo ID: | 8521939 |
VIRIN: | 240627-N-VN697-1815 |
Resolution: | 5608x3678 |
Size: | 2.92 MB |
Location: | PEARL HARBOR, HAWAII, US |
Web Views: | 48 |
Downloads: | 11 |
This work, Pearl Harbor Naval Shipyard Welcomes USS Hopper for Drydocking Selected Restricted Availability [Image 12 of 12], by Claudia LaMantia, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.