Construction crews work on the pump house of the future outdoor pool at Tyndall Air Force Base, Florida, July 10, 2024. The facility will be utilized to filter and treat the water for the pool and two splash pads when complete, estimated for fall 2024. (U.S. Air Force photo by Venessa Armenta)
Date Taken: | 07.10.2024 |
Date Posted: | 07.18.2024 11:31 |
Photo ID: | 8536093 |
VIRIN: | 240710-F-NF392-4000 |
Resolution: | 6048x4024 |
Size: | 4.39 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 21 |
Downloads: | 1 |
This work, Tyndall outdoor pool [Image 7 of 7], by Venessa Armenta, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.