KITTERY, Maine – Portsmouth Naval Shipyard (PNSY) hosted a ribbon cutting ceremony to celebrate the completion of the modernized Berth 6 on Tuesday, July 30. This project was completed as part of the Shipyard Infrastructure Optimization Program. Pictured Capt. Chad Brooks, Officer in Charge of Construction, PNSY speaks to the crowd. Berth 6 now has the capability to meet the challenges presented by climate change and rising sea levels, and the Shipyard has the flexibility it needs to meet the complex demands of modernizing and maintaining fast-attack nuclear-powered submarines of today and in the future. (U.S. Navy photo by Branden Bourque/released)
Date Taken: | 07.30.2024 |
Date Posted: | 08.01.2024 11:49 |
Photo ID: | 8563599 |
VIRIN: | 240730-N-VG694-2008 |
Resolution: | 3600x2400 |
Size: | 2.7 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 41 |
Downloads: | 2 |
This work, Ribbon Cutting Ceremony Held at Portsmouth Naval Shipyard [Image 4 of 4], by Branden Bourque, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.