Steve Szymanski, Crane Operator with USACE, Chicago District, is setting up HYPACK to assist with stone placement.
Date Taken: | 07.31.2024 |
Date Posted: | 08.08.2024 17:46 |
Photo ID: | 8579801 |
VIRIN: | 240731-O-JV047-4345 |
Resolution: | 3958x4000 |
Size: | 2.86 MB |
Location: | MILWAUKEE, WISCONSIN, US |
Web Views: | 18 |
Downloads: | 1 |
This work, USACE Chicago, Lake Michigan Floating Plant, works on Milwaukee Harbor south breakwater [Image 17 of 17], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.