Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Sky Bound: MWSS-174 Marines and 3-25 GSAB conduct external lift operations in preparation for FARP operations [Image 8 of 12]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Sky Bound: MWSS-174 Marines and 3-25 GSAB conduct external lift operations in preparation for FARP operations

    MARINE CORPS BASE HAWAII, HAWAII, UNITED STATES

    08.09.2024

    Photo by Lance Cpl. Carlos Chavez-Flores 

    Marine Corps Base Hawaii

    U.S. Marines with Marine Wing Support Squadron 174, Marine Aircraft Group 24, 1st Marine Aircraft Wing, sling load a quadcon container onto a CH-47 Chinook assigned to Bravo Company, 3rd Battalion, 25th Aviation Regiment, General Support Aviation Brigade, at Marine Corps Air Station Kaneohe Bay, Marine Corps Base Hawaii, Aug. 9, 2024. Fuel issuing equipment was staged at Wheeler Army Airfield in preparation for forward arming and refueling point operations. (U.S. Marine Corps photo by Lance Cpl. Carlos Daniel Chavez-Flores)

    IMAGE INFO

    Date Taken: 08.09.2024
    Date Posted: 08.15.2024 17:43
    Photo ID: 8586103
    VIRIN: 240809-M-OP237-1017
    Resolution: 4210x6315
    Size: 12.18 MB
    Location: MARINE CORPS BASE HAWAII, HAWAII, US

    Web Views: 16
    Downloads: 2

    PUBLIC DOMAIN