Sailors assigned to Naval Mobile Construction Battalion (NMCB) 4 use a heavy-duty inflatable boat to investigate pier damage repair caused by corrosion on August 14, 2024, on Naval Base Ventura County, Port Hueneme, California. NMCB 4 is implementing a robust construction skill training plan to prepare for a dynamic mission set throughout the Indo-Pacific in support of Combatant Commander strategic objectives. (U.S. Navy Photo by Mass Communication Specialist 1st Class Dakota Rayburn)
Date Taken: | 08.14.2024 |
Date Posted: | 08.16.2024 13:30 |
Photo ID: | 8593319 |
VIRIN: | 240814-N-BR551-2019 |
Resolution: | 2815x5004 |
Size: | 7.18 MB |
Location: | PORT HUENEME, CALIFORNIA, US |
Web Views: | 31 |
Downloads: | 4 |
This work, NMCB 4 Sailors Conduct Port Damage Repair Assesment [Image 2 of 2], by PO1 Justin Rayburn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.